Excellent high quality rain gutter downpipe sq. tube roll forming machine
Functions of Downpipe Roll Forming Device
Downpipe / Rainspout Roll Forming Line, can make spherical & sq. downpipe / rainspout, equip with elbow device.
1. Bending precision: the greatest profile deviations (dimensions and condition) shall not exceed the tolerances specified as subsequent data (or equivalent tolerances).
2. Bending quality: capacity to bend the profiles of the specified configuration at the specified optimum steel thickness cracking of the steel or metal coating is not permitted for all necessary metal grades.
three. Highest manufacturing velocity: -fifteen meters per minute.
Apps of Downpipe Roll Forming Machine
The products developed by the downpipe/rainspout roll forming line is broadly used in manufacturing unit, workshop, garage, warehouse, locomotive lose, hanger, exhibition developing, cinema, theatre, stadium, backyard garden etc.
Method Circulation of Downpipe Roll Forming Equipment
Uncoiler — Feeding — Roll Forming — Chopping — Exit Rack — Elbow
Machine Configurations of Downpipe/Rainspout Roll Forming Line
one. 3T Manual De-coiler | two. Feeding Unit |
three. Roll Forming Machine | 4. Publish Cutting Program |
5. Exit Rack | 6. Rainspout / Downpipe Elbow Machine |
two profile in 1 roll forming equipment | |||
Identify | Quantity | Models | |
Decoiler | 1 | Established | |
Main Device | Feeding device | one | Set |
Roll forming system | 1 | Set | |
Cut Equipment | 1 | Set | |
CZPT program | one | Set | |
CZPT control method | one | Set | |
Supporter/Automatic Stacker | 1 | Set |
We can also offer the CZPT devices.
CZPT Knowledge:
1. Manual Decoiler
Decoiler Sort: Handbook Decoiler
Bodyweight Ability Of Decoiler: 3 Ton
Inner Diameter. Φ460-520mm
Outer Diameter. Φ1400mm
two. Roll Forming system
Axis Diameter:60 mm
Forming Roller stand: ten-12Groups
Principal Axis substance: Initial quality forty five# steel, heated and quenched
Roller materials: Initial quality forty five# metal, with tough chrome .05mm, Quenched and heated method
Generate Variety: 1″ Chain of transmission
Chain material: forty five#steel, HRC45-50
Equipment Frame stand: Welded structural steel
Principal motor Electrical power: five.five KW
three. Cutting Device (contain two dimension)
Chopping sort: CZPT cutting
CZPT pump station electricity: 4 KW
CZPT strain: 12Mpa
CZPT Blade and cutter materials: Cr12, quenching approach 58-62
Reducing size tolerance: 10M+/- 2. mm
four. CZPTal Technique
Voltage: 380V, 3 Phase 50Hz
PLC CZPTal handle method: PANASONIC
Size Controller: Encoder Frequency Control Technique
Operation: Contact Screen
Transducer: Japan YASKAWA
5. Runout Table:
Non-energy kind
Amount:two
two profile in one roll forming machine Drawing:
package deal and Guarantee:
one.Nude,with water-proof cloth and stow-wooden.CZPTed computer handle method packed with watertight fabric and card board.
2.This making line is taken care of cost-free of demand for eighteen months.When the equipment is utilised in China,we will install and debug the machine for freeif it is utilized at abroad,we will send out the expert technician to debug.Buyers need to take all the charges for professionals travelling overseas.
3.All the elements in the roll forming equipment is totally free to sustain all the lifestyle,if in 18 months our business bear the cost for exchanged the damaged element like the new components cost and categorical expense,if far more than eighteen thirty day period,we also free to preserve the broken parts but for send the new parts,the buyer need to have bear the express expense.
four.When ship the roll forming machine,We will also ship 1 set CD and specification(Chinese and English) to you with the equipment,they can educate you how to operater the machines.
FAQ:
Q:What’s your Guarantee ?
twelve months, during which all parts damaged due to the fact of high quality dilemma will be modified for free.
Q: What is your shipping and delivery Time ?
In forty five-sixty times following receiving pay as you go. Some equipment in stock, can be delivered at any time.
Q: What is actually your payment phrases ?
30% deposit is paid out ahead of production, the equilibrium paid right after inspection affirmation ahead of shipment.
Q:What is actually your Set up and Training ?
If consumers come to our manufacturing facility to examine, the instruction to put in and function is presented experience to encounter.
If not, manual and movie is offered to display how to put in and run.
Q: What is you following-sale service ?
We offer 24-hour on the web support for our customers.
A.The seller will debug the devices freely in China, and the targeted traffic expenditure in China of the approach folks will be compensated by the vendor.
When technique guys go to the buyer’s area to debug the machines, the customer must shell out the price of accommodation, and site visitors for the buyer’s guys.
B. If the customer sends folks to obtain the education of the operation presented by the vendor, during the training time period, the vendor need to pay the expenditure of lodging, and site visitors for the buyer’s men.
Q: How to area purchase ?
Inquiry—validate the profile drawings and price tag—-verify the PI—set up the deposit or L/C—then Alright
Q: How to visit our company ?
Fly to ZheJiang airport: By higher pace train From ZheJiang to HangCZPT (30 min),then we can decide up you.