Crane 3t 5t Travelling Wire Rope CZPT Electrical power CZPT 5 Ton Value
Introduction:
CD, MD 0.five ~ 32t sequence wire rope electric hoist is a universal portable lifting tools. The item is compact in framework, little in dimension,big in lifting capacity and vast in use. It is an powerful instrument for improving labor problems and improving productiveness,and is a common lifting gadget for industrial and mining enterprises.
Operating Problems:
one.Altitude does not exceed 1000m
2.Ambient air temperature is -20 ° C ~ +forty ° C
three.Ambient air humidity is not much more than 85% (at twenty five ° C)
four.Electrical power: three-section AC, 380V, 50HZ. Motor terminal voltage fluctuation ±10%
five.The electrical hoist is usually mounted indoors. When putting in outside, a rain include must be additional.
When the above environmental problems are not achieved, particular orders are manufactured according to non-standard goods.
Major Construction:
Reducer, working organizations, roller tools, hook products, couplings, versatile cable existing into the system and stopper.
Motor is with cone rotor motors, established the energy and braking pressure in one.
CZPT Wire Rope CZPT-Installation:
a) Utilised with LD and LX solitary beam cranes
b) Mounted on a fixed suspended I-beam rail for linear or curved movement
c) Fastened set up, for lifting or winch, divided into 4 approaches: higher, reduced, still left and right
CZPT hoists are not appropriate for use in environments with explosive or corrosive gases.
They are also not suited for lifting molten,crimson sizzling metals,other flammable and explosive materials.
Type | CD1,MD1 | |||||||||||||||||||||||||
Potential | t | .five | one | two | three | |||||||||||||||||||||
Lifting Height | m | six | 9 | 12 | six | 9 | 12 | 18 | 24 | 30 | six | nine | twelve | eighteen | 24 | thirty | 6 | nine | 12 | 18 | 24 | 30 | ||||
Lifting Velocity | m/min | 8(8/.eight) | eight(8/.eight) | eight(8/.8) | eight(eight/.eight) | |||||||||||||||||||||
Touring Velocity | m/min | twenty(thirty) | twenty(30) | 20(30) | twenty(thirty) | |||||||||||||||||||||
Wire Rope |
Dia. | mm | 4.eight | 7.4 | eleven | 13 | ||||||||||||||||||||
GB1102-74 | 6*37+1 | six*37+1 | 6*37+1 | six*37+1 | ||||||||||||||||||||||
Lifting Motor | Kind | ZD121-four ZDSone-.two/.eight |
ZD122-four ZDS1-.2/1.5 |
ZD131-four ZDS1-.4/3 |
ZD141-4 ZDSone-.4/four.5 |
|||||||||||||||||||||
Electrical power | kW | .8(.two/.eight) | one.5(.2/one.5) | 3(.4/3) | four.five(.four/four.5) | |||||||||||||||||||||
Rotate Pace | r/min | 1380 | 1380 | 1380 | 1380 | |||||||||||||||||||||
Traveling Pace |
Sort | ZDYoneeleven-four | ZDYoneeleven-four | ZDY1twelve-four | ZDY112-4 | |||||||||||||||||||||
Power | kW | .2 | .two | .four | .four | |||||||||||||||||||||
Rotate Speed | r/min | 1380 | 1380 | 1380 | 1380 | |||||||||||||||||||||
Operating Rail | sixteen-28b | sixteen-28b | 20a-32c | 20a-32c | ||||||||||||||||||||||
Operating Obligation | M3 | M3 | M3 | M3 | ||||||||||||||||||||||
Procedure Moments | h | 240 | 240 | 240 | 240 |
CD1,MD1 | ||||||||||||||||||||||||||
Potential | t | five | ten | 16 | ||||||||||||||||||||||
Lifting Height | m | six | 9 | twelve | eighteen | 24 | 31 | nine | 12 | 18 | 24 | 30 | 9 | 12 | eighteen | |||||||||||
Lifting Pace | m/min | eight(8/.8) | 7(seven/.7) | three.5(3.five/.35) | ||||||||||||||||||||||
Touring Pace | m/min | 20(30) | 20(30) | 20(thirty) | ||||||||||||||||||||||
Wire Rope | Dia. | mm | 15.5 | fifteen.five | 15.5 | |||||||||||||||||||||
GB1102-74 | six*37+1 | six*37+one | six*37+one | |||||||||||||||||||||||
Lifting Motor | Type | ZD141-4 ZDSone-.8/seven.five |
ZD151-4 ZDSone-1.5/13 |
ZD1fifty one-four ZDSone-one.five/13 |
||||||||||||||||||||||
Energy | kW | seven.5(.8/7.five) | 13(one.5/13) | thirteen(1.five/thirteen) | ||||||||||||||||||||||
Rotate Velocity | r/min | 1380 | 1380 | 1380 | ||||||||||||||||||||||
Touring Pace | Kind | ZDY121-four | ZDYone21-four | ZDYone21-4 | ||||||||||||||||||||||
Energy | kW | .eight | .8*2 | .eight*2 | ||||||||||||||||||||||
Rotate Speed | r/min | 1380 | 1380 | 1380 | ||||||||||||||||||||||
Operating Rail | 32-45c | 40-63c | 63c | |||||||||||||||||||||||
Functioning Duty | M3 | M3 | M3 | |||||||||||||||||||||||
Procedure Times | h | 240 | 240 | 240 |
Bundle&Shipping
Reated Products
Company Data
CZPTer Praise
FAQ
one. Q: What’s your MOQ?
A: one Set
two. Q: What’s your package?
A: Principal physique in plywood box or in plastic woven cloths CZPT parts in plywood bins
three. Q: What’s your delivery interval?
A: Inside 10/twenty five/40 days soon after your prepayment gained specific period should be dependent on thorough demands and genuine interval
four. Q: What is actually your guarantee interval?
A: 12 months from winches approved
five. Q: Do you have engineer oversea set up services?
A: Yes We have
6. Q: What sorts of products do you have?
A: All varieties of industrial electric powered winch (especially non-normal) Overhead Crane Gantry Crane, CZPT CZPT Screw CZPT
Radial/Flat Gate CZPT Metal Gate and many others.
7. Q: Could we acquire spare parts in local as soon as they are out of perform?
A: Our major electrical parts brand is Siemens or Schneider brand it truly is really effortless to acquire all the world. But if there is any difficulty,
we can submit to you by categorical, such as DHL, UPS, FEDEX, Aramex, and so on.
8. Q: Do you offer lift instruments?
A: Sure, we can offer any sorts of elevate equipment these kinds of as carry sling belt, lift clamp, get, magnet , pulley blocks, hook, lock catch,
wire rope, fiber rope, etc.
nine. Q: Could your winches drag inclined?
A: Yea, our electric powered winches could drag horizontal, drag inclined, hoisting vertical.