BS 6323-2 Hfw 2 Hfw 3 Hfw 4 Hfw 5 Electrical Resistant Welded   ERW Carbon Steel Tube

Portion I: Item INTRODUCTION
1. Commodity: BS 6323-2 electrical resistant welded / ERW metal tube
two. Condition: spherical, rectangular, square,oval,hexagonal,etc.
three. Dimension selection: 10mm*.8mm-80mm*3mm
four. Obtainable metal grade: 

ASTM: MT1571, MT1571
DIN:  ST37, ST44, ST52
EN:  E195, E215,E235,E355, 
GB:  Q195, Q235,Q345

five. Manufacture technique: CZPTal resistant welding
6. Shipping and delivery condition: As welded
nine. End complete: Basic ends with square cuts, free of burrs.
ten. CZPT export packing: In bundles tied with metal strips. Int&ext oil coating. End plastic caps. Exterior packing by PVC luggage and knit baggage. 
eleven. CZPTized packing and marking can be supplied upon request. 

Portion II: Often Questioned Queries
one. MOQ:
three-5 tons/dimensions
two. Shipping and delivery Time: 15-forty five days relying on availability of raw substance in stock.
3. Warranty&Ensure: Guarantee&ensure period of time is 6 months considering that we deliver the tubes, and we are not liable for top quality dilemma brought on by incorrect unloading or storage right after shipment. We welcome customer’s inspection just before shipment. 
4. Payment Method: We settle for payment approach like T/T, L/C, or D/P, but it relies upon on our investigation about buyers. We have a solution to appraise the credit rating of buyers from all in excess of the planet, and time and volume of D/P we can release is identified by the analysis. 
5. Top quality Manage: We buy raw materials from stable suppliers who are foremost metal mills, and we inspect the raw materials as for every the requirements. Throughout our generation treatment, there is inspection and top quality control in every stage. 

Part III: Organization INTRODUCTION
We are a manufacturer of chilly drawn, chilly rolled, and hydraulic chilly drawn metal tubes with OD upto 356mm considering that 2002. Masking an region of about 32000M2, we have twelve standard workshops with 2 hydraulic cold drawing benches, 4 chain chilly drawing benches, and 2 ERW mills. Our facilities handles all the production procedures from pickling, cold drawing, heat treating, noticed cutting, straightening, inspection, packing to more machining &turning, chilly drawing die fabrication, and equipment repairation&routine maintenance. 

Factory Appearance:

ERW WORKSHOP:

ERW ASSEMBLY LINE:

ERW ASSEMBLY LINE:

Routine maintenance&Fix WORKSHOP: 

ERW MODULE WAREHOUSE: 

 

BS 6323-2 Hfw 2 Hfw 3 Hfw 4 Hfw 5 Electrical Resistant Welded   ERW Carbon Steel Tube